Our Process

Seven steps.
Zero guesswork.

Every part that comes through the door follows the same disciplined production process — from request to packaged shipment.

01

Request & Consult

Submit specs, drawings, or samples. We review scope, chemistry, and scheduling within one business day.

02

Intake & Inspection

Parts are received, tagged, and inspected against your PO. Non-conformances are flagged before prep begins.

03

Surface Preparation

Chemical strip, blast, or wash — chosen to match your substrate, coating spec, and end-use environment.

04

Masking & Fixturing

3D-printed masking plugs and custom fixtures protect threads, bores, and mating surfaces with repeatable accuracy.

05

Powder Application

Electrostatic spray in one of two booths. Color, chemistry, and film build controlled to written spec.

06

Cure & QC

Full cure in one of two ovens. Cross-hatch adhesion, mil-thickness, and gloss checks documented per lot.

07

Package & Ship

Parts are un-masked, protected, and packaged for freight, LTL, or customer pickup on schedule.

Ready when you are

Bring us your toughest coating job.